Acuity Insurance Headquarters
Water Walls
Architect: Eppstein Utten Architects
General Contractor: M.A. Mortenson Construction Company
Fountain Consultant: CAE - Design/Build
Type of Structure: Prefabricated polycarbonate wall panels with mounting rails and prefabricated plastic collection trough
Mechanical Systems: Prefabricated, UL listed equipment, skid system and prefabricated upper distribution manifold mechanical system to provide feature recirculation, filtration, sanitation and system controls
This massive lobby water feature sets the tone for arrival. It consists of a 20’ high by 43’ long clear water wall at the buildings main entrance.